Laserfiche WebLink
Trapper Monitoring Wells -Costs to Seal Wells <br />• Uttit Costs <br />Drill Water Flatbed Pickup Dozer <br />Mobile Equipment Rig Truck Truck Truck (D7H) <br />Ownership Cost/Itr = $ 141.04 $ 41.77 $ 39.57 $ 33.14 $ 86.04 <br />Materials & <br />Description <br />$/unit unit <br />cf/unit <br />............. ~ Y.... ,,,,...,..,, <br />Dry Granular Bentonite <br />Surgel Abandonment Fluid <br />Octo Plug <br />Marker <br />• <br /> <br />Itemized Task Breakdown and Associated Costs <br />Borehole or Project I.D.: Trapper Monitoring Wells <br />Total number of Holes = 54 No. Plugs/hole = <br />Task Item Task Description <br />Drill Rig setup over hole, pump slurry, move to next <br />Water Truck standby, use water, refi{I, move to next hole <br />Flatbed Truck standby, store cement & bentonite <br />Pickup Truck transport personnel <br />Dozer regrade area <br />Cement Used for aquifer and groundwater plug <br />Bentonite Used for volume between cement plugs <br />Surgel <br />Octo-plug Used to seperate cement/bentonite regions <br />Marker Need one on each hole <br />Miscellaneous <br />$ 9.00 90# sack <br />$ 6.00 100# sack <br />$ 6.00 100#sack <br />$ 4.35 each <br />$ 2.00 each <br />1 <br />3 <br />3 <br />ity Unit $/unit Cos[ <br />3.0 hrs/hole $ 141.04 $ 22.838 <br />1.0 hrs/hole $ 41.77 $ 2.256 <br />0.5 hrs/hole $ 39.57 $ 1,068 <br />1.0 hrs/hole $ 33.14 $ 1.790 <br />1.0 hrs/hole $ 86.04 $ 4.646 <br />16.0 sacks $ 9.00 $ 134 <br />356.6 sacks $ 6.00 $ 2,139 <br /> $ 6.00 $ - <br />1.0 /hole $ 4.35 $ 235 <br />1.0 /hole $ 2.00 $ 108 <br />Total = $ 35.234 <br />PR4lwells.xls; costs <br />PiIAY 1 3 1998 <br />