Laserfiche WebLink
5/20/97 <br />Page 1 <br />• <br />CJ <br />PR-4 <br />WASTE DRUM DISPOSAL BACKUP <br />Reference: MFJ~NS Building Conslrudion Cost Data -1997; Sedion No. 020 717 XXXX <br />Pursuant to the SPCC Plan -maximum predided 55 gallon drums of waste oil and grease on <br />site is 19 drums. <br />Picku <br />re s rt: <br />Solid: use MEANS XXXX = 1100 <br />200 miles -use average cost: Minimum cost (MEANS XXXX = 1280) <br />Maximum cost (MFJINS XXXX = 1270) <br />Average cost <br />Calculation of transportation cost per drum: <br />200 miles X $3.85/mile / 19 drums = <br />Disposal fDumasite shame): <br />Use average cost: <br />Minimum cost (MEANS XXXX = 8000) <br />Maximum cost (MEANS XXXX = 8020) <br />Average cost <br />Calculation of disposal cost per drum: <br />55 Gal./drum X 1 cu.R.l7.48 Gal. X 70 Ib/cu. R. X 1 ton/2000 lbs. X $200rton = <br />Total Cost: <br />Pickup Transport Disposal <br />$200 $40.53 $51.47 <br />$200 /drum <br />$3.35 /mile <br />$4.35 /mile <br />$3.85 /mile <br />$40.53 /drum <br />$100 Ron <br />E300 /ton <br />$200 rton <br />$51.47 /drum <br />5292.00 !drum <br />. ~rqy 13 1998 <br />RGOW ERMR'1PRnW ~SfaKUP.XLS <br />