My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE125651
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE125651
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:23:01 PM
Creation date
11/25/2007 2:15:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981026
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
2.05 OPERATION AND RECLAMATION PLANS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
that houses the electric controls. The rest of the equipment is <br />•~ not enclosed and includes a hopper, feeder-breaker, crusher and a <br />150 ft stacking belt. <br />At this time no additional facilities are planned <br />for the permit area. However, Wyoming °uel may move its crushing <br />facilities, office and stockpile area to the flat-lying area near <br />Phase IX shown on Figure 2. If this move is made, appropriate <br />technical revisions in the permit will be submitted to assure com- <br />pliance with applicable regulations. <br />Since all of the existing structures are either <br />prefab or mobil, removal of the structures and subsequent grading, <br />topsoiling and reclamation should not be difficult or expensive. <br />A11 the structures meet the performance standards <br />as specified in Rule 4. This is evidenced by the fact that in over <br />a year of inspections by the Colorado Mine Reclamation Board, Office <br />of Surface Mining, Colorado Division of Mines and the Mine Safety <br />and Health administration, we have had no violations concerning our <br />structures. <br />At this point in time, we do not anticipate modify- <br />ing or reconstructing any of the existing structures. <br />(c) Description of Roads, etc. (see Figure 2). <br />No conveyor or rail systems are planned within the <br />permit area. All roads other than the haul roads will be constructed <br />in the pit and will be advanced and reclaimed as the pit is <br />advanced and reclaimed. <br />The temporary in-pit roads will include 10 to <br />• 15 percent ramps along the exposed coal and between benches, and <br />a 10 percent ramp from lower levels to the upper backfill levels <br />-31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.