My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE125552
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE125552
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:22:56 PM
Creation date
11/25/2007 2:07:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997014
IBM Index Class Name
Permit File
Doc Date
11/30/1996
Doc Name
MANAGEMENT PLAN FOR DEER CREEK QUARRY COG-500666
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~=ASPHALT MANUFACTURING <br />A hot-mix asphalt oiant blends mgether aggregate and asphalt cement to produce a <br />hot, homogeneous asphalt paving mixture which is then hauled to off-site construction <br />projects. The aggregate used can be a single material, such as a crusher run <br />aggregate or a pit run material, or it can be a combination of coarse and fine <br />aggregates. with or without mineral filler. The binder material used is normally asphalt <br />cement but can also be an asphalt emulsion or one of a varier/ of moeified materials. <br />Various additives, including liquid and powdered materials, can also be incorporated <br />into the mixture. <br />Activities at these sites may include the following: raw material unloading into <br />stockpiles or storage tanks, raw material feed to plant, material botching, raw material <br />storage area, recyclable asphalt disposal area, truck wash out, and water supply and <br />settling takes. <br />=READY MIXED CONCRETE <br />These operations mix sand, gravel, cement. and ~Nater together to form ready mix <br />concre*,e, which is hauled to off-site construction projects. <br />Ready Mixed concrete is produced at these locations by combining raw materials in <br />a mixer, ~n~hich can be stationary (central mix plant) or truck mounted. The raw <br />materials are made up of sand, gravel, cement, water and additives. The sand and <br />gravel is either stored in stockpiles located outside and fed into the plant via loader <br />and conveyors, or it is directly stored in a series of hoppers located directly above the <br />central plant. The remainder of the raw materials are stored in tanks to protect them <br />from exposure to moisture and temperature unfit they are pumped into the mixer. <br />Once the raw materials are fed into the mixer and combined to form ready mix <br />concrete, the final product Is removed from the site by truck. <br />Dry Botching is apportioning out and dumping the mix into the concrete truck or mixer <br />while the cement truck continues to agitate at a lower speed to keep it from hardening <br />before it arrives at the site. <br />Activities at these sites may include the following: raw material unloading into <br />stockpiles or storage tanks, raw material feed to giant, material botching, raw material <br />storage area, recyclable concrete disposal area, truck wash out, and water supply and <br />settling lakes. <br />EQUIPMENT FUELING <br />Diesel and/or gasoline tanks are located on site for fueling of equipment. Off-site <br />vendors refill tanks as needed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.