Laserfiche WebLink
<br />NICHOLSON GRAVEL PIT <br />EXHIBIT E (ammended 5/8/86) <br />Reclamation Plan: <br />The seeding process shall consist of either drill seeding <br />or broadcast seeding. If broadcast, the seeding rates shall <br />be doubled and followed by the harrowing of the area. <br />Following seeding, mulch shall be applied as specified in <br />Standards and Specification For Mulching, Technical Guide <br />Section IV, Soil Conservation Service, February 1982. Plans <br />and procedures previously listed in reclamation plans dated <br />April 2 and May 5, 1986 shall be followed except where <br />ammended. <br />