Laserfiche WebLink
<br />anticipated future use of the site is recreation and tourist sight-seeing. Exhibit D -Reclamation <br />Plan of this application describes the measures Sierra intends to take to ensure a stable <br />configuration for the site. <br />Lm1 Processie¢ oe Site: Sierra anticipates no processing on site except for marble <br />cutting or polishing operations. Such processing operations will occur underground and involve <br />no process chemicals. <br />(e) Primary Commodities: The primary commodity produced is dimension stone in <br />the form of white mazble blocks, slabs, and tiles. These may be further processed off-site, for <br />eventual sale to large and small marble installation shops around the world. The end use of the <br />material is for azchitectural, sculpture, and monument applications. Secondary commodities <br />produced may be waste marble to be crushed and processed off-site for use in landscape and <br />other applications. <br />(o) Iecideetal Products: There are no incidental products to be produced by the quarry. <br />22 <br />