Laserfiche WebLink
pPR__19-9?_MON 03:55 PM FCI LFINDSCC.PE X93 272 1571 P. BS <br />• <br /> <br />{ ~ ~-- <br />-=~~- <br />-.~,~~.> <br />:=;. <br />~;:. <br />P'~~.~~, <br />4u.~ <br />BCI LANDSCAPE CONTRACTORS, INC. <br />6_x.3 EYN BT.~T C'-.Minin <br />(d) The thickness of the flagstone we will be mining will <br />range from 1/2" to 8" thick pieces, with a total height of any pit <br />wall at 20 to 30 feet. <br />(e) We will be using the existing road (as shown on 6.3.1 <br />Exhibit Map) and a spur road that runs directly below the quarry <br />pits. 'The spur road will be used by the loader to transport pallets <br />to staging area, which is off the main road. Our office and all <br />maintenance operations will be performed off site. <br />(f) The existing quarry pit floors will be enlarged l 0-20 <br />feet in diameter and the pit walls will increase iul height by 20-30 <br />feet. The waste rock stockpiles generated during the quarrying <br />process should not exceed 20 feet in diameter by 5 feet in height. <br />This waste rock will be used in the reclamation process. <br />Pre-Mining <br />r (r o tk afU55~ <br />;a.. _- <br />=, <br />~-~.,: <br />e~-` 9 <br />Post Mining <br />y~_lA~ <br /> <br />__ _ ~,~ <br />0 <br />$ Seed <br /> <br />~' J <br />- P ~-- <br />(g) The existing main road averages 14' wide at the wid st <br />point and 12' wide and the smallest point. The road is composed <br />of gravel, soil and stone, sufficient for a large truck to access. We <br />do not plan to improve the road. There are no drainage az runoff <br />problems. The latezal toad is approximately 8' wide, sufficient to <br />drive a loader with pallets. <br />\1 <br />~ EQ <br /> <br />~:clryc ~k- <br />(h) There is no water required to quarry flagstone. <br />