Laserfiche WebLink
~ ~ . : ~...,. •+A•: (r Ci err -~;` ~ ~: •: pi •: `i "i .~:' :. '.•.'. '. ': n .. ... _ ~ ~ _ ~ <br />~ /j:• •r.. •.l ~: (.~. ~. .: \... :):1•`.. '.. .., ••i', (:; ri :~V•a~~'•~t 1, •yM1,Si+. <br />. ~~: 'CCy~9-0064-18 ,; ~.X;, k.; <br />• Y nco Creek /`' ' ' '.~•~• <br />. ADDITIONAL CONDITIOt[S ' <br />1. Contractor shall start excavation at face of existing pit and excavate <br />1n a south and westerly direction, not to exceed the area indicated on <br />' the attached map nor exceed the depth of the present plt. <br />2. Locatlon of contractor's equipment including crushers, steles and batch <br />plant shall be discussed with owner prior to start of operation and any <br />future relocation. <br />3. The owner shall have first right of refusal to purchase any surplus of <br />crushed material at [he same price charged the highway department. <br />4. One cent per ton or 1.5 cents per yard of the agreed royalty of 16 cents <br />per ton and 24 cents per yard shall be considered as compensation for <br />Sdhite River Aggregates, Inc. to effect the reclamation of this operation. <br />5. Provisions shall be made to protect owner's livestock. <br />6. The contractor shall pay the property owner for all materials removed. <br />Payment therefore shall be in monthly installments; each monthly payment <br />shall be based upon the quantity included in the Department's progress <br />estimate for the preceding month, and the same shall be made on or before <br />the 20th day of each month. The contractor shall retain ten (10) percent <br />of the money due the property owner until final yardage or tonnage is <br />determined by the Department. <br />7. Topsoil overburden will be removed and hauled to area indicated on attached <br />map and stockpiled for final reclamation. Sagebrush to be piled for burning <br />in a designated area. <br />8. Trash disposal area during construction period shall be designated by owner. <br />No off-spec material shall be left or burned on leased area but placed in <br />an area designated by owner. <br />9. Any roads, other than ones designated by ormer, shall be removed and seeded <br />also. <br />10. The owner will assume responsibility of the Land Reclamation Board permit <br />at the expiration of this optioa. ' <br />11. It is to be noted that Aztec Redi-Mix Inc, is in adjacent plt area. <br />12. A cattle guard is to be installed in the haul road by the contractor and <br />left in place. • <br />C <br />F <br />r <br />r <br />t` . <br /> <br />1 <br />.. ' <br />,~ <br /> <br /> <br />• <br />• <br />.. <br />_ I <br /> <br />t <br />II <br />I <br />i <br />. <br />C <br />