My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE125362
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE125362
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:22:47 PM
Creation date
11/25/2007 1:49:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X200521710
IBM Index Class Name
Permit File
Doc Date
9/1/2005
Doc Name
Completeness Letter & Bond Estimate Attached
From
DMG
To
J.E. Stover & Associates
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # ; X02 <br />Date : 09/01/2005 <br />User <br />JRS <br />County :Delta <br />Site :Bowie No. 2 Mine <br />Agency or organization name :Colorado Division Of Minerals And <br />Permit or other job action :Notice of Intent X-2005217-10 <br />Task description : Regrade Drill Pads <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D9R - 9SU <br />Blade type :Semi-Universal <br />Attachment na. 1 : RODS Cab <br />Attachment no. 2 :3-shank ripper <br />Horsepower: 405 <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $51.01 NA <br /> Operatingcost/hour : $93.55 100 <br /> Ripper op. cosUhour : $0.00 0 <br /> Operator cosf/hour : $31.78 NA <br /> Total unit cost/hour : $176.34 Total fleet cost/hour : $176.34 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 1,300 BCY factor : 1.250 volume: 1,625 LCY <br /> <br />Source of estimated volume :Operator Estimate <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION Job Condition Conection Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 75 feet Matedal consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 1, 514.3 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshifl/day) <br />Compacted fill or embankment Spoil pile : 0.80 (fid-rf) <br /> Push gradient : 0.90 (Cat HB) <br />Average push gradient : 5.00 % (pos) Altitude : 0.95 (Cat HB) <br />Average site altitude : 8, 000 feet Material weight : 0.79 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight ; 2,900 Ibs/LCY Net correction : 0.31 <br />Weight description <br />Decomposed rack - 50% Rock, 50°6 Earth <br />Adjusted unit production : 461.88 LCY/hr <br />Adjusted fleet production : 461.88 LCY/hr <br />JOB TIME AND COST _ ..... <br />Fleet size : 1 Dozers) Total job time : 3.52 Hours <br />Unit cost : $0.382 /LCY Total job cost : $620 <br />State :Colorado <br />PermiVjob# : C-1996-083 <br />Abbreviation :none <br />Filename : C083-X02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.