Laserfiche WebLink
<br />E:dHIBIm B <br />idining Plan <br /> <br />Itiiaing will begin in present excavation and ~rcc r:ed ro:`i: in t•.vc <br />sta€es,wrs*, and sout:: ~iil ;.it area is cz single elevation. a~bsequcnt <br />excavaticns of aprreximatel;; ~(; ft ,rill be wide. stockpiling and <br />crushing on preceedinf; levels until enough room is eacavated to move <br />operations tc ~rtraction level. Extractior. will begin on south end of <br />each lift. leaving stockpiles on uor'.h end of preceeding level for <br />easy access 3Waj from crusring operations. <br />Extraction will be dcae ~xith loaders which will also feed crushing <br />cperation. Access road will alternately enter extraction area on east <br />side from proceeding level and west side from present road onto cxtrac- <br />tion level. <br />