Laserfiche WebLink
diversion structure, and the protective clay cap. (In the event that acceptable inert clay materials <br />for capping are not available on site, the applicant will need to include the cost for importation of <br />such materials). An itemized cost for mobilization/demobilization of reclamation equipment will <br />also need to be included. The Division will calculate a final reclamation cost once all direct <br />reclamation costs have been identified. (ie, the final reclamation cost will include both direct and <br />indirect costs). <br />Once again, I will look forwazd to your response on or before July 26, 2004. Rule 1.8.1 states <br />that changes and additions to the permit application must be filed with the Division and the <br />County Clerk and Recorder. The applicant must also provide the Division with an affidavit or <br />receipt demonstrating that the change or addition was filed with the County Clerk and Recorder <br />no later than the close of business on the day the change was filed with the Division. <br />Please contact me at (303) 866-3567 if you have any questions. <br />Sincerely, <br />~Ip ~ <br />Thomas A. Schreine~r~ <br />Environmental Protection Specialist <br />cc: Carl Mount, DMG (via E-Mail) <br />