Laserfiche WebLink
5. Describe Exploration Activities; Rule 2/02.2(2)(8): See attached discussion <br />a. Attach a narrative description of methods and equipment to be used to conduct coal <br />exploration activities. Include drilling operations, surface blasting, road or access route <br />construction, excavated earth and debris disposal activities. Also describe measures to be <br />taken to protect the environment: topsoil salvage, diversion of overland flow, settling <br />ponds, etc. <br />b. Specifically address: <br />1) Location and acreage of areas where topsoil will be salvaged and stored; <br />2) How much earth moving will be needed for new roads or drill sites, if any; <br />3) What seed mix (type and amount) will be used for revegetation; <br />4) Depth of drill holes; <br />5) Whether aquifers will be encountered (include supporting references); <br />G) Precise description of how drill holes will be sealed and plugged in accordance with <br />Rule 4.07; and <br />• 7) Whether holes will be developed as water wells and, if so, the well pemut issued by <br />the Colorado Division of Water Resources. <br />6. Attach a statement with appropriate references from the relevant State or Federal agencies <br />or published sources, which determines that the exploration and reclamation described will <br />not jeopazdize the continued existence of an endangered or threatened species listed <br />pursuant to Section 4 of the Endangered Species Act of 1973 (16 U.S.C. 1533) or the <br />Nongame, Endangered or Threatened Species Conservation Act (Section 33-8-101 et se . <br />C.R.S. 1973) or result in the destruction or adverse modification of critical habitat of those <br />species. (Rule 2.02.2(2)(h) See attached discussion <br />7. Does the applicant wish any parts of this Notice to be considered CONFIDENTIAL? <br />No If yes, the material should be attached as a separate document and cleazly marked <br />"Confidential." Justification for requesting the confidentiality must be included with the <br />request. Note: Rule 2/02.7(2)(6) only allows confidential material that concerns trade <br />secrets or is privileged commercial or financial information which relates to the competitive <br />rights of the person intending to conduct coal exploration. <br />8. Has this complete Notice been put on file at the county courthouse in the vicinity of the <br />exploration azea, as required by Rule 2/02.7? Yes_ <br />9. Have reclamation costs been included with this Notice to assist in determining the amount <br />of Performance Bond required, if any? No - SCC will submit a Corporate Surety, which <br />• will serve as a Performance Bond, upon notice from CDMG as to the required <br />amount. <br />10. How will the reclaimed drill hole locations be marked? Appropriately labeled <br />monument marker placed in concrete plug. <br />3 <br />