Laserfiche WebLink
~IRCES C st Est mati S ftw <br />EQUIPMENT MOBILRATION /DEMOBILIZATION <br />Agency or organization name :OMG <br />Taskp: 004 State:Cclorado Permit/ob N: M-2002-068 <br />Date: 0]/252002 Counry:Phillips Abbreviation:none <br />User: ESC Site:Ensminger Pd Filename: M06B-004 <br />Permit or otherjob adim: New PermRAppllcafion <br />Task description : MobillzatioNDemobllizatipn <br />OUIPMENT TRANSPORT RIG COST Shitt basis : I per day <br />Cost data source: CRG Data <br />Truck tractor description :Generic on-highway truck hector. 6x4, diesel powered. 400 HP <br />Truck trailer description :Generic loldin9 ooseneck, dmp deck equipment hailer (25i, SOT, and 90T) <br />Available rig capacities: 0-25 Tons <br />Cost 8reaktlewn ~ Ownership cosMOUr : 524.34 <br />Operetin cosMour. $2H.49 <br />Operator cost/nour: $D.0] <br />Nelper cosghour. $0.00 <br />Total Unit CosMoun $]9.90 <br />NON-ROADABLE EOUIPMENi <br />Machine WeighVunit Ownership Haul Rig Fleet Size <br />Descriplicn (Tons) Costfir/unit GosMr/unit (NO. units) 26-50 Tons 51+TOns <br />$26.99 533.09 <br />530.2] $34.34 <br />$2].07 5270] <br />$23J8 523J8 <br />$/OH.11 $118.28 <br /> <br />Haul Trip Return Trip DOT permit <br />Coshnr/fleet CcsVhr/fleet CosVlleet <br />-Ca(DHR-BSU 46.85 $42.20 $108.11 1 5150.31 5i08.fi $0.00 <br />-Raveg Eq. 20.00 560.00 $]9.90 1 5139.90 $]9.90 50.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> Sgbtotals $190.21 $18H.01 50.00 <br />ROADABLE EQUIPMENT <br />Machine Total Fleet Slze <br />Description osVhour/unit (NO. units) <br />Haul Trip Return Trip <br />Castor/fleet CosUhrttleet <br />-Light DU PickuP• 4x2, f2 L $31.89 f 531,89 331.89 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals 531.89 531.89 <br />EDUIPMENT HAUL DISTAN CE dTIM E <br /> Nearest mal or city or town within project area region : Haxron <br />Tr ~oortatinn Cvc~e T me: Non- Telal one-way travel distance: 25 miles <br /> Roadable Roadable Average travel speed: SS.C mph <br /> Equipment Equipment <br />Haul time(hours)= 0.05 0.05 Total non-roadable mob/demob cos!-: $623.90 <br />Return time (hours) = 0 05 0.05 'Iwo room viva w4h wul rig <br />Loatling time (hours) = 050 NA Total roatlable mob/tlemob cost'-: $2.90 <br />Unloatling time (hours)= 0.50 NA one munEfnp, no Haul og <br />Sublomis= 1.09 O.C9 <br />JOB TIME AND COST Total job time: 2.18 hours <br /> To[al job cost $627 <br />