Laserfiche WebLink
<br /> <br />RECLAMATION COST SUMMARY cont'd sheet 3 of 4 <br />H. EARTHWORK STREAM CHANNEL RECONSTRUCTION <br />Task No.~ Task Description ~ Cost (S) <br />Subtotal (H): <br />____________ <br />1. EARTHWORK -DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task No.~ Task Description ~ Cost (f) <br />___I______.._~_ <br />7 ~ Concrete Lined Irrigation Channel ~ (60,000 <br />~ (5300.00/ty • 200 cy) Operator Estimste ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />Subtotal (I): 560,000 <br />~. EARTHWORK -TOPSOIL/SUBSOIL REPLACEMENT <br />Task No.~ Task Description ~ Cost (S) <br />_____...~______________________.._______________..______..._I___..____.__ <br />3 ~ Replace Topsoil ~ (643 <br />~ ~ <br />Subtotal (J): (693 <br />