Laserfiche WebLink
• Violation No. 5: 34-33-120 (2)(q) ti (R) <br />Failure to construct access roads in a manner which will control erosion, <br />minimize siltation, and refrain from altering the normal flow of water down <br />~~ a channel. <br />A. History: <br />Fti story Total: 5 0.00 <br />B. Seriousness: <br />I) Probability of Occurrence: Damage did occur at the site. Since <br />damage did occur, the assessment For probability of occurrence is 5875.00. <br />Occurrence Total: S 875.00 <br />2) Duration and Extent of violation: <br />a) a short duration time was assessed, since the damage has occurred <br />recently. Since a short duration time was assessed, the penalty <br />for duration is 5145.80. <br />Duration Total: S 145.80 <br />• <br />b) the extent of damage is relatively small. The penalty assessed <br />for small extent is 5145.80. <br />Extent Total: S 145.80 <br />C. Fault: <br />The violation occurred as a result of a greater degree of fault than negligence. <br />The penalty assessed for fault is 51,500.00. <br />Fault Total: 51,500.00 <br />TOTAL ASSESSED FOR TNIS VIOLATION: <br />52,666.60 <br />• <br />