My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_PERMIT FILE - M1995035 (8)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M1995035
>
_PERMIT FILE - M1995035 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2024 5:06:02 PM
Creation date
11/25/2007 1:24:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1995035
IBM Index Class Name
Permit File
Section_Exhibit Name
EXHIBIT E RECLAMATION PLAN
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Connell plans to mine to the claystone bedrock. The claystone is generally competent and will <br /> withstand erosional forces. However, some areas might not contain marketable sand and gravel <br /> down to the bedrock. This areas will remain exposed until the reservoir is filled with water. To help <br /> suppress dust, Connell will consider seeding areas of the reservoir bottom that have a high potential <br /> for dust emission. <br /> Processing& Asphalt Batch Plant Site/Equipment <br /> The processing equipment, asphalt batch plant, and other equipment are portable and will be <br /> removed from the site following the completion of the project. <br /> Gradine <br /> Grading will be done to provide stabilized shorelines around the reservoir. All backfilling will be <br /> done using native overburden, topsoil and claystone. There are no known toxic materials in the <br /> proposed backfill material. <br /> All grading will be done to prevent erosion. Final grading will be done immediately after topsoiling <br /> has been completed. Backfilling will be completed in phases after mining is completed. <br /> All slopes left by the mining operation will be no steeper than 3H:1 V from five feet above to ten feet <br /> below the water elevation (including the islands). All other slopes will be no greater than 2H:1 V. <br /> Earthen berms will be place along the north and east edges of the property prior to completing <br /> mining in Phase 2. These berms will serve as a visual screen of the property. <br /> Topssoiling <br /> The topsoil will stockpiled for the reclamation process. Topsoil stockpiles which remain in place <br /> longer than one growing season will be seeded with an Annual Rye Grass. It will be hand broadcast <br /> at rate of four pounds per acre. Handling of topsoil will be minimized by efficient sequencing of the <br /> mining. <br /> Stripped topsoil will be stockpiled out of the floodway to reduce the risk of inhibiting the flow of <br /> a flood. In addition, the stockpiles will be aligned with the natural flow of the river. In Phase 2 <br /> topsoil will be temporarily stockpiled along sections of the phase perimeter and will be used to <br /> reclaim once the aquitard is established. In Phases One and Three through Seven, Connell will limit <br /> the amount of topsoil stockpiled at any one time by continuously using it to cap backfilled areas. <br />
The URL can be used to link to this page
Your browser does not support the video tag.