My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE125058
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE125058
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:22:32 PM
Creation date
11/25/2007 1:24:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010A
IBM Index Class Name
Permit File
Doc Date
2/15/2006
Section_Exhibit Name
Appendix A TOC to TALPAC
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Trapper Mining <br />2005BOND <br />Talpec <br />2005 Bond Topsoil Replacement <br /> .. <br /> Haulage System: Trapper Mining Inc. 2005 Haut Cycle: [PRJ] E78.2 to D PitltB (25,238 Cyds.) <br /> Material: PRJ To soil Roster: PRJ 5 da Week - 8 Hour Shifts <br /> --~ •~r- <br /> Availability % 100.00 <br /> Average Bucket Volume cu.yards 38.02 <br /> Bucket Fill Factor 0.72 <br /> Average Payload bcy 25.00 <br /> Operating Hours per Year OpHr/Year 1,957.50 Op. hrs factored by availability <br /> Average Operating Shifts pet Year shiftsNear 261.00 Shifts factored by availability <br /> Average Bucket Cycle Time min 0.50 <br /> Production per Operating Hour bcy 709.72 <br /> Production per Loader Operating Shift bcy 5,323 Max. prod. Nosed on 100%avall. <br /> Production per Year bcy 1,389,286 Avg. production factored by avail. <br /> Wait Time er 0 eratin Hour min 39.23 <br /> ~; <br /> =t-. <br /> Availability. % 92.50 <br /> Payload in Template bcy 25.00 <br /> Operating Hours per Year OpHr/Year .1,810.69 <br /> Average Payload 'bcy 25.00 , <br /> Production per Operating Hour bcy ~ 191.82 <br /> Production per Loader Operating Shift bcy 1,331 <br /> Production per Year bcy 347,322 <br /> Queue Time at Loader min/ Cycle 0.06 <br /> Spot Time at loader miN Cycle 0.00 ' <br /> Average Loading Time miN Cycle O.5D <br /> Average Travel Time miN Cycle 5.87 <br /> Spot Time at Dump miN Cycle 0.10 <br /> Average Dump Tima miN Cycle 0.50 <br /> Average Cycle Time miN Cycle 7.03 <br /> Fleet Size ~ 4 <br /> Avera a No. of Bucket Passes 1.00 <br /> <br /> Production per Year bcy/Year 1,389,286 <br /> Discounted Capital Cost $/bcy - 0.00 Loading Methodology <br /> Discounted Operating Cost $/bcy 0.00 Double Sided <br /> Discounted Average Cost $/bcy 0.00 Full Bucket <br /> Average for 150 Shifts <br /> Productivity estimates allow for insufficient time at t he end of the shift to complete another cycle. <br /> Time for the first bucket pass coincides with the truck queuing and maneuvering times. <br /> This simulation is based on data provided by the equipment manufacturer. <br /> Equipment data should be checked to ensure it is valid for this site. <br /> <br /> <br />Trapper <br />Prepared by: Tonia Perkins 4-Aug-2005 10:31 AM Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.