Laserfiche WebLink
Trapper Mining <br />200560ND <br />Talpac <br />2005 Bond Topsoil Replacement <br /> .. <br />~ <br /> Haulage System: Trapper Mining Inc. 2005 Haul Cycte: (PRJ] LG1 to D Pit 1f1-(17,263 Cyds.) <br />• Material: PRJ To soi! Roster: PRJ 5 da Week - 8 Hour Shifrs <br /> <br /> Availability % 100.00 <br /> Average Bucket Volume cu.yards 38.02 <br /> Bucket Fill Factor 0.72 <br /> Average Payload bcy 25.00 <br /> Operating Hours per Year OpHdYear 1,957.50 Op. hrs factored by availability <br /> . Average Operating Shifts per Year shitts/Year 261.00 Shifts factored by availability <br /> Average Bucket Cycle Time min 0.50 <br /> Production per Operating Hour bcy 1,473.33 <br /> Produption per Loader Operating Shift bcy' 11,050 Max. prod. based on 100% avail. <br /> Production per Year bcy 2,884,046 Avg. production factored by avail. <br /> Wait Time er O eratin Hour min 24.57 <br /> <br /> Availability % 92.50 <br /> Payload in Template bcy 25.00 <br /> Operating Hours per Year OpHr/Year 1,810.69 <br /> Average Payload bcy 25.00 <br /> Production per Operating Hour bcy 398.20 <br /> Production per Loader Operating Shift bcy 2,762 <br /> Production per Year bcy 721,011 <br /> Queue Time ai Loader miN Cycle 0.09 <br /> Spot Time at loader miN Cycle 0.00 <br /> Average Loading Time miN Cycle ~ 0.50 <br /> Average Travel Time miN Cycle 2.22 <br /> Spot Time at Dump miN Cycle 0.10 <br /> Average Dump Time miN Cycle 0.50 <br /> Average Cycle Time miN Cycle 3.40 <br /> Fleet Size 4 <br /> Avera a No. of Bucket Passes 1.00 <br /> rx <br />".;b `;.: <br /> Production per Year bcy/Year 2,884,046 <br /> Discounted Capital Cost $/bcy 0.00 Loading Methodology <br /> Discounted Operating Cost $/bcy 0.00 Double Sided <br /> Discounted Average Cost $/bcy 0.00 Full Bucket <br /> Average for 150 Shifts <br /> Productivity estimates allow for insuffi cient time at the end of the shift to complete another cycle. <br /> Time for the first bucket pass coi ncides with th e truck queuing and maneuvering times. <br /> This simulation is based on data provide d by the equipment manufacturer. <br /> Equipment data should be checked to ensure it is valid for this site. <br />• <br />Trapper <br />Prepared by: Tonia Perkins 4-Aug-2005 10:27 AM Page 1 <br />