Laserfiche WebLink
Trapper Mining <br />2005BOND <br />Talpac <br />2005 Bond Topsoil Replacement <br /> • .. <br />• Haulage System: Trapper Mining Inc. 2005 tau! Cycle: (PRJ] 093-i to D Road #3 (20,570 Cyds.J <br /> Materiel: PAJ To sot/ Roster: PRJ 5 da Week - 8 Hour Shifts <br /> ,_ <br /> Availability % 100.00 <br /> Average Bucket Volume cu.yards 38.02 <br /> Bucket Fill Factor 0.72 <br /> Average Payload xy 25.00 <br /> Operating Hours per Year OpHdYear 1,957.50 Op. hrs factored by availability <br /> Average Operating Shifts per Year shifts/Year 261.00 Shifts factored by availability <br /> Average Bucket Cycle Time min 0.50 <br /> Production per Operating Hour bcy 1,226.57 <br /> Production per Loader Operating Shift bcy 9,199 Max. prod. based on 100°~ avail. <br /> Production per Year bcy 2,401,001 Avg. production factored by avail. <br /> Wait Time er O eratin Hour min 29.38 <br /> Availability % 92:50 <br /> Payload in Template bcy 25.00 <br /> Operating Hours per Year OpHdYear 1,810.69 <br /> Average Payload bcy ~ 25.00 <br /> Production per Operating Hour bcy 331.50 <br /> Production per Loader Operating Shift bcy 2,300 <br /> Production per Year bcy 600,250 <br /> Queue Time at Loader miN Cycle 0.08 <br />• Spot Time at loader miN Cycle 0.00 <br /> Average Loading Time miN Cycle 0.50 <br /> Average Travel Time miN Cycle 2.90 <br /> Spot Time at Dump miN Cycle 0.10 <br /> Average Dump Time miN Cycle 0.50 <br /> Average Cycle Time miN Cycle 4.06 <br /> Fleet Size 4 <br /> Avera a No. of Bucket Passes 1.00 <br /> Production per Year bcy/Year 2,401,001 <br /> Discounted Capital Cost $/bcy 0.00 Loading Methodology <br /> Discounted Operating Cast $/bcy 0.00 Double Sided <br /> Discounted Average Cost $/bcy 0.00 Full Bucket <br /> Average for 150 Shifts <br /> Productivity estimates allow for insuN icient time at the end of the shift to complete another cycle. <br /> Time for the first bucket pass coi ncides with the truck queuing and maneuvering times. <br /> This simulation is based o n data provided by the equipment manufacturer. <br /> Equipment data should be checked to ensure it is valid for this site. <br /> <br />• <br />Trapper <br />Prepared by: Tonia Perkins 4-Aug-2005 10:25 AM Page 1 <br />