My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE125058
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE125058
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:22:32 PM
Creation date
11/25/2007 1:24:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010A
IBM Index Class Name
Permit File
Doc Date
2/15/2006
Section_Exhibit Name
Appendix A TOC to TALPAC
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Trapper Mining <br />2005BOND <br />Talpac <br />2005 Bond Topsoil Replacement <br /> .• <br /> Hau/age System: Trapper Min(ng /nc. 2005 Haul Cycle: (PRJ] A76.4 fo D Road #2 (7,805 Cyds.] <br />• Material: PRJ To soil Roster: PRJ 5 da Week - 8 Hour Shifts <br /> <br />_ ~. :t s r- <br /> Availability % 100.00 <br /> Average Bucket Volume cu.yards 38.02 <br /> Bucket Fill Factor 0,72 <br /> Average Payload bcy 25.00 <br /> Operating Hours per Year OpHr/Year 1,957.50 Op. hrs factored by availability <br /> Average Operating Shifts per Year shifts/Year 261,00 Shrfts factored by availability <br /> Average Bucket Cycle Time min 0.50 <br /> Production per Operating Hour bcy 1,146,62 <br /> Production per Loader Operating Shift bcy 8,600 Max. prod. based on 700%avail. <br /> Production per Year bcy 2,244,510 Avg. productlon factored by avail. <br /> Wait Time er O eratin Hour min 30.93 <br /> ~` ~ - <br /> Availability % 92,50 <br /> Payload in Template bcy 25.00 <br /> Operating Hours per Year OpHr/Year 1,810,69 <br /> Average Payload bdy 25,00 <br /> Production per Operating Hour bcy 309.90 <br /> Production per Loader Operating Shift bcy 2,150 <br /> Production per Year bcy 561,727 <br /> Queue Time at Loader miN Cycle 0.08 <br />• Spot Time at loader miN Cycle 0,00 <br /> Average Loading,Time miN Cycle 0,50 <br /> Average Travel Time miN Cycle 3,19 <br /> Spot Time at Dump miN Cycle 0.10 <br /> Average Dump Time min/ Cycle 0.50 <br /> Average Cycle Time miN Cycle 4.37 <br /> Fleet Size 4 <br /> Avera a No. of Bucket Passes 1.00 <br /> Production per Year bcy/Year 2,244,570 <br /> Discounted Capital Cost $/bcy 0.00 Loading Methodology <br /> Discounted Operating Cost $/bcy 0.00 Double Sided <br /> Discounted Average Cost $/bcy 0.00 Full Bucket <br /> Average for 150 Shifts <br /> Productivity estimates allow for insuffi cient time at t he end of the shift to complete another cycle. <br /> Time for the first bucket pass coincides with the truck queuing and maneuvering times. <br /> This simulation is based on data provided by the equipment manufacturer. <br /> _ Equipment data should be checked to ensure it is valid for this site. <br />• <br />Trapper <br />Prepared by: Tonia Perkins 4-Aug-2005 10:25 AM Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.