Laserfiche WebLink
Trapper Mining <br />2005BOND <br />Talpac <br />2005 Bond Topsoil Replacement <br /> .. <br /> Haulage System: Trapper Mining Inc. 2005 Haul Cycle: jPRJ] WC1 to BC4 (17,704 Cyds.] <br />. Material: PRJ To soil Roster: PRJ 5 da Week - 8 Hour Shifts <br /> ~ ,~ • a. <br /> Availability % 100.00 , <br /> Average Bucket Volume cu.yards 38.02 <br /> Bucket Fill Factor 0.72 <br /> Average Payload bcy 25.00 <br /> Operating Hours per Year OpHdYear 1,957.50 Op. hrs factored by availability <br /> Average Operating Shifts per Year shifts/Year 261.00 Shifts factored by availability <br /> Average Bucket Cycle Time min 0.50 <br /> Production per Operating Hour bcy 847.28 <br /> Production per Loader Operating Shift bcy 6,355 Max. prod. based on t00q° avail. <br /> Production per Year bcy .1,658,558 Avg. production factored by avail. <br /> Wait Time er O eratin Hour min 36.67 <br /> - :x <br /> Availability ~ % 92.50 <br /> Payload in Template bcy 25.00 <br /> Operating Hours per Year OpHdYear 1,810.69 <br /> Average Payload bcy 25.00 <br /> Production per Operating Hour bcy 229.00 <br /> Production per Loader Operating Shift bcy ~ 1,589 <br /> Production per Year bcy 414,639 <br /> Queue Time at Loader miN Cycle 0.07 <br /> Spot Time at loader miN Cycle 0.00 <br /> Average Loading Time miN Cycle 0.50 <br /> Average Travei Time miN Cycle 4.72 <br /> Spot Time at Dump miN Cycle 0.10 <br /> Average Dump Time miN Cycle 0.50 <br /> Average Cycle Time miN Cycle 5.90 <br /> Fleet Size 4 <br /> Avera a No. of Bucket Passes 1.00 <br /> Production per Year bcy/Year 1,658,558 <br /> Discounted Capital Cost $lbcy 0.00 Loading Methodology <br /> Discounted Operating Cost $/bcy 0.00 Double Sided <br /> Discounted Average Cost $/bcy 0.00 Full Bucket <br /> Average for 150 Shifts <br /> Productivity estimates allow for insufficient time at the end of the shift to complete another cycle. <br /> Time for the first bucket pass coi ncides with the truck queuing and maneuvering times. <br /> This simulation is based on data provided by the equipment manufacturer. <br /> Equipment data should be checked to ensure it is valid for this site. <br />r1 <br />LJ <br />Trapper <br />Prepared by: Tonia Perkins 4-Aug-2005 7:20 AM Page 1 <br />