My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE125058
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE125058
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:22:32 PM
Creation date
11/25/2007 1:24:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010A
IBM Index Class Name
Permit File
Doc Date
2/15/2006
Section_Exhibit Name
Appendix A TOC to TALPAC
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C~ <br /> <br />• <br />Trapper Mining <br />2005BOND <br />Talpac <br />2005 Bond Topsoil Replacement <br />.. <br />Haulage System: Trapper Mining~lnc. 2005 Haul Cycle: fPRJ] WC1 to Coyote2 (15,488 Cyds.) <br />Material: PRJ To sail Roster: PRJ 5 da Week - 8 Hour Shilts <br /> r -r s r: <br />Availability % ~ 100.00 <br />Average Bucket Volume cu.yards 38.02 <br />Bucket Fill Factor 0.72 <br />Average Payload bcy 25.00 <br />Operating Hours per Year OpHr/Year 1,957.50 Op. hrs factored by avallatNlity <br />Average Operating Shifts per Year shifts/Year 261.00 Shifts factored by availability <br />Average Bucket Cycle Time min 0.50 <br />Production per Operating Hour bcy 415.17 <br />Production per Loader Operating Shift bcy 3,114 Max. prod. based on t00q° avail. <br />Production per Year bcy 812,686 Avg. production factored by avail. <br />~ <br />Wait Time er O eratin Hour min 44.30 <br />Availability °k 92.50 <br />Payload in Template bcy 25.00 <br />Operating Hours per Year OpHr/Year 1,810.69 <br />Average Payload bcy 25.00 <br />Production per Operating Hour bcy 112.21 <br />Production per Loader Operating Shift bcy 778 <br />Production per Year bcy 203,172 <br />Oueue Time at Loader miN Cycle 0.05 <br />Spot Time at loader miN Cycle 0.00 <br />Average Loading Time miN Cycle 0.50 <br />Average Travel Time miN Cycle 10.79 <br />Spot Time at Dump miN Cycle 0.10 <br />Average Dump Time miN Cycle 0.50 <br />Average Cycle Time miN Cycle 11.94 <br />Fleet Size 4 <br />Avera a No.of Bucket Passes 1.00 <br />Production per Year bcy/Year 812,686 <br />Discounted Capital Cost $/bcy 0.00 Loading Methodology <br />Discounted Operating Cost $lbcy 0.00 Double Sided <br />Discounted Average Cost $/bcy 0.00 Full Bucket <br /> Average for 150 Shifts <br />Productivity estimates allow.for insufficient time at the end of the shift to complete another cycle. <br />Time for the first bucket pass coincides with the truck queuing and maneuvering times. <br />This simulation is based on data provided by the equipment manufacturer. <br />Equipment data should be checked to ensure it is valid for this site. <br />Prepared by: Tonia Perkins <br />Trapper <br />4-Aug-2005 7:09 AM Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.