Laserfiche WebLink
. TR-96 Reclamation Bond-Miscellaneous Costs <br />Pond Cleaning During Liability Period <br />Assumptions: <br />During first year -eight weeks of pond cleaning required <br />During second year -three weeks of pond cleaning <br />No pond cleaning required years 3-10 <br />Costs: <br />Equipment Type Ownership Op 8 OH Operator Total <br /> <br />CAT 3226 hydr. Exc. $22.57 $30.06 $30.65 $83.28 <br />End Dump Haul Truck (10 cyd) $10.25 $20.85 $24.80 $55.90 <br />End Dump Haul Truck (10 cyd) $10.25 $20.85 $24.80 $55.90 <br />Total Cos[ per Hour $43.07 $71.76 $80.25 $195.08 <br />Year one hours 320 <br />Year one cost $ 62,426 <br />Year two hours 120 <br />Year two cost $ 23,410 <br />• Total Cost $ 85,835 <br />~_~~~ _ ~ ~I~s~~ <br />