Laserfiche WebLink
• PART I <br />Page le of 19 <br />Permit 1Jumber: CO-0034142 <br />B. MONITORING REQUIREMENTS (Continued) <br />1. Frequency and Sample Type (Continued) <br />(c) Discharge Point(s) 023 <br />Effluent Parameter Measurement Frequency d/ Sample Type e/ <br />Flow, MGD Weekly Instantaneous <br />or Continuous <br />BODS, mg/1 k/ Monthly Grab <br />Total Suspended Solids, mg/1 k/ Monthly Grab <br />Fecal Coliforms, Number/100 ml Monthly Grab <br />pH, s.u. Weekly Grab <br />011 and Grease, mg/1 Weekly Visual or Grab <br />• Total Residual Chlorine, mg/1 Weekly Grab <br />Salinity pz/ Quarterly h( Grab <br />2. Monitoring and Reporting <br />Reporting of the above data shall be on a monthly basis. Refer to <br />Part I.D.2 for specific requirements. <br />Sampling by the permittee far compliance with the monitoring <br />requirements specified above shall be performed at the following <br />location(s): outfalls 002, U03, 004, 006, 007, OU9, 011, 012, 013, <br />014, 015, 016, 017, 018, 019, 020, 021, 022 and 023, as shown in <br />Figures 1 and 2. <br />Monitoring by the Division for the purpose of compliance and/ or <br />enforcement of the effluent limitations shall be performed as per <br />"Sample Type" specified above. <br />3. Flow Measuring Exemption or Modification <br />IJot applicable <br />• <br />See Part I.C. for Footnotes. <br />