Laserfiche WebLink
CIRCES Cost Estimatins~ Software <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />231 <br />O6r07/2006 <br />State :Colorado <br />County :Delta <br />PermiVjob # : C-1996-083 <br />Abbreviation :none <br />BOREHOLE DESCRIPTION SEALING ITEM /METHOD DIAMETER LENGTH QUANTITY UNIT UNIT COST TOTAL COST <br />-Bottom Plug PVC plug - 8 in. 8" NA 2.00 EA $144.80 $289.60 <br />-Fill Holes with Cement Portland cement grout 8" 2, 545' 444.00 bag $8.25 $3, 663.00 <br />-Cut Casing at SuAace Ezp. rasing removal, 8-16 in. 8" NA 2.00 LF $11.40 $22.80 <br />-Borehole Marker Borehole marker NA NA 2.00 EA $3.56 $7.12 <br />-Drill Rig Time TLAS COPCO ROC D7-11, 4. NA NA 24.00 HR $190.02 $4,560.58 <br />-Water Truck Time Water Tanker, 2,500 Gal. NA NA 24.00 HR $41.55 $997.08 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />JOB COST Total Cost <br />