Laserfiche WebLink
LJ <br />82-79 BRENNER PIT <br /> <br />Ten inches topsoil will be removed and stockpiled somewhere close to <br />pit. Weeds and grass will naturaly vegetate stockpile. <br />Five foot of overburden to be removed and replace gravel removed before. <br />5 foot sand. <br />No groundwater encountered. <br />Kit Carson County Road & Bridge will follow the Soil Conservation Service's <br />recomendation for reclamation plans--grass, shrubs, etc. <br />For temporary abandonment for erosion problem, we doze a ridge of soil <br />and gravel to keep the water from entering the pit. <br />