Laserfiche WebLink
• <br />Table 1.4-72. Revegetation Treatment Sequencing and Associated Production <br />Costs Per Acre Excluding Regrading and Topsoil Replacement. <br />Total Cost: Operator, <br />Land Use Production Rate Equipment 8 Attach. Production Cost <br />A, B, C (1) Treatment Operating Equipment (Acres/Hr.) (2) ($/Hr.) (3) ($/ Acre) _ <br />B, C Scarification 4WD Farm Traotor/Disc 3.4 $80.88 $23.78 <br />A Pick Rock 4 Cu. Yd. Wheef Loader 1.4 $69.77 $49.84 <br />A, B, C Drag Topsoil 4WD Fans Tractor/Disc 3.5 $80.88 $23.10 <br />A Disc Seedbed (6) 4WD Farm Tractor/Disc $33.42 <br />A Drill Seed Perennial Hay Crop (6) 4WD Farm Treotor/Drill $45.84 <br />B Drill Seed Grazing Lands (8) 4WD Farm Tractor/Drill $45.84 <br />C Drill Seed Grazing Lands (6) 4WD Farm Tractor/Drill $45.84 <br /> Shrubs/Hour /Hour $ Per Shrub Pad <br />C Shrub Transplanting (4) 4.3 Cu. Yd. Std. Wheel Loader 1.5 $69.77 $46.51 <br />~- <br />i <br />~' FeeUHour /Hour er 100 Ft. of Ditch <br />rn <br />B, C Install Erosion control Ditches (5) 215 HP Motor Grader 194 $88.18 $44.41 <br />(1) A = Cropland, B =Grazing Land, C =Rangeland <br />(2) Based on actual reclamation production rates. <br />(3) These costs are from Table 1.4 -13; include equipment, operator and attachments. <br />(4) Each mature shrub clump is composed of 250 shrub pads. <br />(5) Assumes 3 passes are needed to construct each erosion control ditch on reclaimed areas. <br />(8) CDMG rates minus 10% profit. <br />