<br />TaEle 1.441. Caltulatlon for 71me Requlrad to Ragrede RoWa
<br />Flea) Coet
<br /> Operation 6
<br />Equlpmem Ownership Overhaul AttechmeMs• Operator Total
<br />single shift
<br />Cet D10R w/rlpper 70.80 112.14 13.01 30.85 228.80
<br />Light PIeM 0.00 0.00 0.00 0 0
<br />Total 70.80 112.14 13.01 30.85 228.80
<br />' Ripper costa (rwluded for rtpPfrgl, omated lar gmdi~
<br /> Length Volume Yolume RlppMg Reprade
<br />Road Deaerlptlon Type (R) )beya) @28%awell Hours Hours
<br />BC Road Welk 9,160 188,237 207,798 188 168
<br />2 Welk Road Welk 5,297 98,131 120,183 97 98
<br />DMAIN Welk Q,700 121,593 151,991 123 121
<br />DOS Heul 1,100 18,333 22.917 19 18
<br />D Loop Heul 2.500 41,667 52,083 42 42
<br />003,4 Heul 3,000 50,000 82,500 51 50
<br />001 Haul 4,800 50,000 100,000 81 80
<br />ASHWEST Heul 9,800 183,333 204,187 165 163
<br />ASHEAST 01 Heul 4,700 85,296 108,620 88 85
<br />ABREAST 02 Haul 4,100 7d,407 93,009 75 74
<br />~ LOM Welk 17,400 316,778 394,722 319 315
<br />to Middle A Heul 8,800 148,867 183,333 118 148
<br />Q` North A Heul 5,200 88,887 108,333 88 88
<br />FS Haul 1,300 21,887 27,083 22 22
<br />F4 Heul 3,000 50,000 82,500 51 50
<br />F3 Heul 2,200 38,867 45,833 37 37
<br />F2 Heut 3,300 55,000 88,750 58 55
<br />FMAIN Heul 2,400 40,000 50,000 40 40
<br />West EF Heut 900 15,000 18,750 15 15
<br />EF Heul 1,200 20,000 25,000 20 20
<br />WeW G1 Heul 900 15,000 18,750 15 15
<br />West 02 Heul 800 13,333 18,887 13 13
<br />Went O3 Heul 1,300 21,887 27,083 22 22
<br />East O Heul 2,d00 10,000 50,000 40 40
<br />East A Haul 5,700 95,000 118,750 88 95
<br />EeatASplk Haul 1,700 28,333 35,417 29 28
<br />Mtne Access Access 8,600 54,022 87,528 55 54
<br />
<br />
|