Laserfiche WebLink
• <br />Table tA•2 Summery d reo ade costa <br />AtlJusted <br />Pueh Produdlvky Correction Produdlvlty Dozer Unk Coat Total <br />Pk Cuble YAMS Dlatanca (kylhr) Factor (IeyRu) Hours (flhr) Cosyf) <br />Ash Disposal 887,494 499 628 0.78 d73 2,020 233.10 170,789 <br />D/E PN•dozer 1,551,185 255 1140 0.82 935 1,889 233,10 393,807 <br />DiE PN •screl»re 2,889,048 ne 1894 1.00 1594 1800 1788.17 3,211,740 <br />FPIt DIDIine 3,751,757 377 819 0.82 672 5,875 233,10 1,322,839 <br />F PN Strikellne 3,946,333 507 603 0.82 495 7,978 233,10 1,859,683 <br />East F PN 2,111,848 422 729 0.82 598 3,851 233.10 851,020 <br />G Pit•screpers 762,926 ne 852 1.00 852 895 1853.20 1,859,433 <br />G PN•dozers 3,049,585 565 685 0.82 480 8,420 233.10 1,498,421 <br />Total 19,060,174 320 881 0.80 889 30129 11,265,732 <br />Drill and Blast ~ Cuble Vards Benching f Drilling f Blasting f Total f <br />N DIE Ph 379,900 8,189 28,220 41,789 78,197 <br />' F PN Dipllne-highvrell 736,111 17,380 50,804 80,9M 149,137 <br />F Pit Stdkellne • hlphwall 0 0 0 0 0 boxcul <br />East F PN • hlghwell 390,833 9,217 26,974 42,992 79,183 <br />GPit-highwell 372,500 8,785 26,709 10,975 75,4 <br />~ Ash Dump-highwell 418,667 9,827 28,757 45,833 84,417 <br />w Total 2,286,011 53,378 158,464 252,581 184,403 <br /> <br /> Adjusted <br /> Pueh Protluctlvky Correction Produetlvky Dozer Unk Cost Total <br />Wscrlptlon Cubic Vards Dlatante (kymr) Factor (IcyRU) Mours (flhr) Coat(f) <br />Roeda•Rlpping 2,183,630 Ne 1500 0.88 990 2,185 228.80 495,231 <br />Roeda-Regrede 2,704,538 80 1900 0.68 1250 2,157 213,59 460,858 <br />impoundmams 288,282 280 788 0.13 330 812 204.72 168,303 <br />Diversions 23,243 16,778 <br />Finish Oreding• 895 1118,70 74,205 <br />Tolel Regrede S 12,943,305 <br />• Cat iBH, 2298 acres, 3.3 acres per hour <br />