My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE124652
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE124652
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:22:11 PM
Creation date
11/25/2007 12:50:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002111
IBM Index Class Name
Permit File
Doc Date
9/24/2003
Doc Name
Adequacy Review
From
DMG
To
Elam Construction Inc
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />Task no. <br />Date <br />User: <br />01a <br />State :Colorado <br />09l22I2003 - County:Mesa <br />SSS Site : Gilsonite Pit <br />Pertnitlob no.: M-2002-111 <br />Abbreviation :none <br />Filename : M111-0fa <br />Agency or organization name : DMG <br />Pennit or otherjob action :New 112c permR <br />task description : DBwater Phases <br />HOURLY EQUIPMENT COST <br />and 5 feet of Phase 1 <br /> <br />Description Quantity Data <br />Source <br />Pump : Cenhifugal pump, 12.0 in. - 2 (CRG) <br />Suction hose : Suction pipe, 12 in. diem., 25 ft. L 4 ~ (CRG) <br />Discharge hose : Discharge pipe, 12 in. D, 25 ft. L ~ ~ 6 (CRG) <br />Labor: NA 0 NA <br />Cost Breakdown : Job Utilization <br />Ownership cost/hour: $33.76 NA <br />Operating cosUhour: $31.06 100 <br />Operetor cosVhour: $0.00 NA <br />Total cosUhour: $64.82 <br />Job shift basis : 1 per day <br />Horsepower: 90 <br />Weight (UST) : 2.60 <br />Total fleetcosUhour: $64.82 <br /> <br />PUMPING QUANTITIES <br />Initial pond Conversion Final pond <br />volume: 99,377,784.00 gallons factor: 1.0000 volume: .99,377,784 gallons <br /> <br />Total pond in6ow surface UnR inHOw rate in Total pond inflow volume ' <br />area : NA sq. ft. gph/sq. ft.: NA per hour : 0.00 gph <br /> <br />Source of volume estimate :Exhibits C-2 and F. 10' water depth <br /> <br /> <br />PUMPING TIME <br />Rated pump capacity : 350,000 gph/pump Total pumping capacity : 700,000 gph <br /> Initial unadjusted pumping lime : 141.97 hours <br />Inflow as % of pond volume : NA °h Inflow during initial pumping time : 0 gallons <br /> Nei unadjusted pumping time : 141.97 hours <br /> <br /> Pump efficiency factor : 0.9167 (55 min./hr) <br /> Total adjusted pumping time : 154.87 hours <br /> <br /> <br />JOB TIME AND COST <br /> Total job time : 154.87 hours <br />Unit cost : $0.000101 per gallon Total job cost : $10,038 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.