Template:
DRMS Permit Index
Permit No
M2002111
IBM Index Class Name
Permit File
Doc Date
9/24/2003
Doc Name
Adequacy Review
From
DMG
To
Elam Construction Inc
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 07a <br />Date : 09/23/2003 <br />User: SSS <br />State :Colorado <br />County :Mesa <br />Site : Gilsonite Pit <br />Permiflob# : M-2002-111. <br />Abbreviation :none <br />Filename : M111-07a <br />Agency or organization name : DMG <br />Permit or otherjob action :New 112c <br />Task description :Spread 5 <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />over 25% of Staging Area <br />Basic machine :Cat D9R - 9SU <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :3-shank ripper . <br /> Utilization <br />Ownership cost/hour : $51.07 NA <br />Operating cost/hour : $97.71 100 <br />Ripper op.cosUhour : $0.00 0 <br />Operator cost/hour : $31.83 NA <br />Total unit cost/hour : $180.61 Total fleet wst/hour <br />MATERIAL QUANTITIES <br />Initial <br />volume : 1,815 LCY <br />Operator skill : 0.75 <br />Material consistency : 1.20 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.60 <br />Push gradient : 1.00 <br />Altitude : 1.00 <br />Matedal weight : 0.90 <br />Blade type : 1.00 <br />Net correction : 0.40 <br />Source of estimated volume :Assume 25% of Staging Area needs gravel for reclamation <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION <br />Average push distance : 50 feet <br />Unadjusted hourly production : 2,110.5 LCY/hr <br />Material cohsistency description <br />Loose stockpile <br />Average push gradient : 0.00 % (1 <br />Average site altitude : 4,460 feet <br />Material weight : 2,550 Ibs/LCY <br />Weight descdption <br />Gravel -Dry <br />$180.61 <br />Source <br />Adjusted unit production : 852.88 LCY/hr <br />Adjusted fleet production : 852.88 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 2.13 Hours <br />Unit cost : $0.212 /LCY Total job cost : $384 <br />Swell Loose <br />factor: NA volume: 1,815 LCY <br />Horsepower: 405 <br />Shift basis : 1 perday <br />Data source : (CRG) <br />