Laserfiche WebLink
<br />Table 6 <br />REPLACEMENT OBLIGATIONS <br />NCCI Pit No. 1 <br /> <br /> (1) (2) (3) (4) (5) <br /> Re lacement Obli tions Farm Tatal Unmet <br />Month Lagged Historical Total Headgate Replacement <br />Month Mining Return Flow Replacement Deliveries Obligations <br /> Depletions Obligations Obligations <br /> (acre-feet) (acre-feet) (acre-feet) (acre-feet) (acre-feet) <br />anuary 1.15 0.12 1.27 0.00 1.27 <br />February 1.06 0.11 1.16 0.00 1.16 <br />March 1.02 0.10 1.12 0.01 1.11 <br />April 1.08 0.12 1.20 0.28 0.92 <br />May 1.14 0.22 1.35 0.90 0.45 <br />une 1.19 0.31 1.50 1.19 0.31 <br />my 1.23 0.41 1.64 1.52 0.12 <br />August 1.27 0.44 1.70 1.31 0.39 <br />September 1.29 0.39 1.68 0.79 0.89 <br />October 1.30 0.30 1.59 0.32 1.27 <br />November 1.30 0.21 1.50 0.01 1.49 <br />December 1.25 0.15 1.41 0.00 1.41 <br />Total 14.27 2.86 17.13 6.33 10.80 <br />Notes: <br />(1) From Table 2, Column (7) <br />(21 From Table 5, Column (9) <br />(3) Column (1) + Column (D <br />(41 From Table 5, Column (11 <br />(51 Maximum of Column (3) -Column f4) and zero. <br />4 3-2614 _ 006. m m c\NCCI 35 h. x I s <br />Rocky Mountain Consultants, Inc. 1/10/02 Table 6 <br />