Laserfiche WebLink
CIRCES Cost Estimating Sofhvare <br />EQUIPMENT MOBILIZATION /DEMOBILIZATION <br />PROJECT IDENTIFICATION <br />Agenty or organi]ation name :OMG <br />Task#: 12a State :Caloratlo PerrruVOb#:M-2002-111 <br />Date: 03/izR006 County :Mesa AbbreNation :none <br />User: SSS Site :Gdmnde Pd Filename :M111-12a <br />Permit or otherjob action :New <br />Shift basis <br />Cost tlata source <br />RDADABLE EOIIIPMENT <br /> Nearest rtejor ary or town within project area region : Fruda <br />7ransoonatiw CVde Time: Non- Total one-way travel tlistance: 3.0 mles <br /> Roadable Roafable Average travel speed: 30.0 rtgh <br /> EPUipment EpuiPment ' <br />Haul time (hours) = 0.10 010 Total non-roadable mob/tlemob cost-: 51,]03.29 <br />R¢lum time (flours)= 0.10 0.f0 •MO muM Mpa xiN foul eq <br />Loafing time (hwrs)= 0.50 NA Total rcafable mob/demob cost^: 861.62 <br />Un108tling Ome (hours) = 0.50 NA ore mono mp, m nom ro <br />Subtotals= 1.20 0.20 <br />JOB TIME AND COST Total job time: 2.40 hours <br />Total job wst : 51,785 <br />