Laserfiche WebLink
ESTIMATING FORM - REVEGETATI ON WORK cont'd Filename M038-007 sheet 2 of 2 <br />B. SNRUB 8 TREE TRANSPLANTS <br />____________________________ ~ ~ MATERIAL: PLANTING: ~ E/PERT. ~ TOTAL ~ TOTAL <br />SPECIES NAME I OUAN./ACRE ~ STOCK TYPE 8 S12E ~ 5/PLANT ~ E/PLANT PELLET E/PLANT I E/ACRE <br />No transplants required I ~ ~ 50.00 <br /> Total transplant cost/acre: 50.00 <br />L. SEEDBED PREPARATION = ___________ <br />Tilling method #1: chisel plowing " <br />#2: <br />D. SEED APPLICATION <br />____________________ <br />____________________ <br />Seeding method: drill seeding " <br />556.02 <br />Total cost/acre: 556. 02 <br />Total cost/acre: 562. 54 <br />E. FERTILIZING <br />--------------= FERTILIZER / SOIL AMENDMENT ~ UNITS/ACRE UNIT ~ E/UNIT E/ACRE <br />_________________________________________________________====I==========I=========I=====________ <br />Materials used #1: No fertilizer/amendments required ~ ~ ~ ~ 50.00 <br />#2: <br />#3: <br />Total materials cast/acre: 50.00 <br />Application method #1: No fertilizer application required <br />#2: <br />50.00 <br /> Total application cost/acre: 50.00 <br />F. MULCHING = ___________ <br /> MULCH / NETTING / OTHER MATERIALS <br />___ <br />_____ <br />_________ <br />a ~ UNITS/ACRE UNIT <br />_===== <br />=======e=========c==== ~ 5/UNIT <br />=========== 5/ACRE <br />==cvv=c==__ <br />Materials used #1: _===== <br />______________ <br />_____ <br />straw (delivered) - ton • I <br />~ 1.00 ~ ton l <br />~ 578.17 ~ 578.17 <br /> #2: <br /> #3: <br /> #4: ~ ~ <br /> Total materials cost/acre: 578.17 <br />Application method #1: power mulch er (hay spr. 1" deep) "• 562.42 <br /> #2: <br /> #3: <br />Total application cost/acre: 562.42 <br />G. JOB COST ---------___ <br />Total area [o be seeded: 4.50 acres. Total 5/acre 5365.82 Total Initial Job Cost= 81,646.21 <br />___________ _________ ____________ <br />___________ _________ ____________ <br />Estimated failure rate: 20.00 of area. Total 5/acre' 5365.82 Total Reseeding Costs = 5329.24 <br />___________ g _________ _ ____________ <br />• Reseedin cost items: A C D F GRAND TOTAL JOB COST 51,975.45 <br />