Laserfiche WebLink
(4) All fees collected under this Rule shall be deRsited in the~eneral fund <br />• RESPONSE <br />A fee of two thousand five hundred dollars ($2,500.00) was submitted as the permit fee required under this Section <br />with the permit revision application. <br />Presently there are 3,199.1 acres that are affected, i.e. overlie longwall mined or mining areas. This includes those <br />areas included within original permit, Southwest Mining District and the Eastern Mining District. For the <br />remainder of the Eastern Mining District (panels 2 Right through 6 Right) and the Northern Mining District (panels <br />12 Right through 17 Right) a total of 1,145.9 acres will be affected. The total for all the mined and proposed to be <br />mined areas is 5854.30 acres. The total of Life of Mine permit boundary is comprised of 23,040. 9 acres and is <br />shown on Maps 1 and 2. The total disturbance area is 429.4 acres. <br />NORTHERN MINING DISTRICT (Panels ]2 Right through 16 Right) <br />The Northem Mining District will add 2,279.2 acres to the affected acreage category (Map 23). The Life of Mine <br />permit boundary has not changed due to the addition of this mining district. <br />• <br /> <br />I9PPR~'JJ?u'1~ ,IJPJ Z 4 2000 <br />PR 99-OS 2.01 ~ 2/24/99 <br />