Laserfiche WebLink
• iii iiiiiiiiiiiii iii ~ <br /> 999 <br /> STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Depanmem o~ Natural Resources <br />1 313 Sherman ~L, Room 215 <br />Denver, Colorado 80203 <br />DIVISION O F . <br />Phone: (3031 866-3587 MINERALS <br />FAS: (3031 832-8106 & <br /> GEOLOGY', <br /> RECLAMATION <br />MINING•SAFETY <br />June 13, 2000 <br />sill oven, <br />Governor <br />Mr. Robert A. Lucero Oreg E. Walther <br />Las Animas County E.ecuGve D~reclor <br />200 E. First, Rm. 104 Michaels. L°ns <br />Drvis~on Duector <br />Trinidad, CO 81082 <br />RE: Castillo Pit, M-2000-053, Permit Issuance - County~Construction Material Operation <br />Dear Mr. Lucero: <br />On June 12, 2000 the Division of Minerals and Geology found Las Animas County to have satisfied the <br />applicable requirements of C.R.S. 34-32.5-101 et sec .for obtaining a mining and reclamation permit. <br />Therefore, a permit is being issued. Two signed originals of the permit have been executed. We have <br />kept one copy for our files and aze enclosing one copy for your use. It is your responsibility to comply <br />with all of the terms of the permit. <br />1. All of the original application materials, as amended and supplemented, are an integral part of <br />your permit. They have been incorporated into the permit by reference. We presume that you have a <br />copy of all of these materials; therefore, none have been enclosed with this mailing. We suggest that <br />you keep a copy of the permit and the permit application at the mining operation as a reference for <br />operating personnel, to help ensure compliance with the terms of the permit. <br />2. Changes in the mining and reclamation operations that differ from those described in the permit <br />may require a modification to the permit. We suggest consulting the Construction Materials Rules and <br />Regulations and/or contacting us to determine if a revision to the permit is necessary. Rule 1.10 <br />pertains to Amendments, Rule 1.9 to Technical Revisions, and Rule 1.11 to Conversions. <br />3. On your permit anniversary date each yeaz, June 12, 2000, you must submit an annual fee and an <br />annual report to us. The annual fee for this permit is $281.00. Please consult the Act, Rules and <br />Regulations, and your permit for specific annual report requirements applicable to your mine. <br />If you have any questions, please contact the Division. <br />Since el~ <br />1/~~/Lc.v~~ ~j~~ A <br />KfIC~L B. LONG ~ ~~~ <br />Division Director <br />MBL/JCS/sme <br />