Laserfiche WebLink
• POST REGRADING DRA IIJAGE APSD SEDIMENT CONT RGL PLAC7 <br />INTRODUCTION <br />Once Einal grading is completed and prior to reestablishment of <br />vegetation to regulatory standards the following drainage and sediment <br />control structures will remain or be added: <br />Ponds: <br />• Sedimentation Pond 4 <br />• Sedimentation Pond 5 <br />Channels: <br />• Access Road Drainage Ditch and associated Culverts <br />• Permanent Diversion Ditch 1 <br />• West Refuse Collection Ditch <br />• South Refuse Collection Ditch <br />• North Refuse Collection Ditch <br />• Magpie Creek Diversion <br />SAE: <br />• • Explosive Bunker <br />• Pock Dust Storage Facility <br />• Sub Station No. 2 and Power Line <br />• South Fan <br />• Yard Area (New) <br />• Top ;oil File (New) <br />The location of all these structures are shown on Map 30, Southfield <br />Reclamation Map. <br />PONDS <br />A detailed design description of Sedimentation Ponds 4 and 5 (including <br />Attachment 1 - SEDCAD4 printouts) will ba submitted with a TR is a few <br />weeks, which will complete this section of the Permit document. <br />• <br />207 <br />