Laserfiche WebLink
<br />' (ii) Moderate disturbance - Th e total area under this cater, <br /> be less than 5 acres. It will include overburden shaping, ~ <br />' , parking, working, and equipment storage . The pond area will <br /> <br />i ally cover 75-80% of the entire <br />(iii) Mi <br />t <br />di <br />b <br />T site. <br />ill <br />l <br />5 <br /> nor <br />ur <br />ance - <br />s <br />here w <br />be ess than <br />acres to <br />~ will undergo slope preparation prior to any revegetation. <br />E. Timetables <br />(i) Time periods - The material mined from this pit will I~~~ . <br />primarily for road base and gravel road maintenance in the soul <br />part of Weld County. It has been estimated that the pit will h,.. <br />' a lifetime of 20 years. The pit will be divided into 4 acres o, <br />stages with roughly 5 years per stage. <br />(ii) Size and locations - Each area will be approximately 10 ac <br />in size. The locations are shown on EXHIBIT C. Each area will <br />' roughly 300 feet east to west by 1300 feet north and south. <br />' (iii) Sequence - Stage 1 will be on the eastern side and operatio~ <br />will progress to the west. EXHIBIT C shows the intended sequence, <br />Stages 1-4. <br />F. Soil Profile <br />The overburden and topsoil is 2 to 3 feet thick and consists of <br />grayish brown loam to about 10 inches, brown to light yello~,isi, <br />brown clay to 25 inches, and calcareous loamy sand or sandy loam <br />to about 30 inches. <br />The material to be mined consists primarily of freely draining <br />1 pea-sized gravel to a depth of 25 feet and beyond. <br /> <br /> <br />.~ <br /> <br />I <br />r <br />t <br />, <br />