Laserfiche WebLink
~ 111 IIIIIIIIIIIII III ~ <br />STATE OF <br />COLORADO <br />DIVISION OE MINERALS AND GEOLOGY <br />Department ul Natural Resources <br />131 }Sherman SI.. Room 215 <br />Denver, Coloracla 80203 <br />DIVISION OF <br />Phone: (3031 8fi6-3567 MINERAL S <br />FAX. (10 31 312-8106 & <br /> GEOLOGY <br /> ftEC LA MATION <br /> MINING•SAFEiY <br />August 23, 1999 <br /> gill Owens <br /> <br />Mr. Luis M. Vasquez Governor <br /> <br />P.O. Box 122 Greg E. Watcher <br />E.ecuave Dlceaor <br />Lyons, CO 8OS4O Michael B. Long <br /> Orvisron D,rector <br />Re: Red Wolf Quarry, Permit No. M-99-0ti3, Permit Issuance -Construction Material Operation <br />Dear Mr. Vasquez: <br />On August 23, 1999 the Division of Minerals and Geology found Luis M. Vasquez to have satisfied the <br />applicable requirements of C.IZS. 34-32.5-101 et esq. for obtaining a mining and reclamation permit Therefore. <br />a permit is being issued. Two sierted originals of the permit have been executed. We have kept one copv for <br />our files and are enclosing one wpy for your use. It is your responsibility to comply with all of the terms of the <br />permit. <br />1. All of the original application materials, as amended and supplemented, aze an integral part of your <br />pemut. They have been incorporated into the permit by reference. We presume that you have a copy of all of <br />these materials; therefore, none have been enclosed vvith this mailing. We suggest that you keep a copy of the <br />permit and the permit apphcation at the mining operation as a reference for operating personnel, to help ensure <br />compliance with the terms of the permit. <br />2. Changes in the mining and reclamation operations that differ Gom those described in the permit may <br />require a modification to the permit. We suggest consulting the Construction Materials Rules and Regulations <br />and/or contacting us to determine if a revision to the permit is necessary. Rule 1.10 pertains to Amendments. <br />Rule 1.9 to Technical Revisions, and Rule 1. l I to Conversions. <br />3. On your permit anniversary date each year, August 23, you must submit an annual fee and an annual <br />report to us. The annual fee for this permit is $225.00. Please consult the Act, Rules and Regulations, and your <br />permit for specific annual report requirements applicable to your mine. <br />If you have any questions, please the contact the Division. <br />Sincerely . <br />ICHAEL B. <br />Division Director <br />MBL/TASlBDC <br />Enclosure <br />nt ~ossaDC~rEtiwatAr_so6g rns <br />