Laserfiche WebLink
4- <br />12. Primary future /Post-mininel land use (check one): <br />Cropland(CR) Pastureland(PL) <br />_ General Agriculture(GA) <br />x Rangeland(RL) Forestry(FR} <br />_ Residential(RS) Recreation(RC) <br />Developed WaterResources(WR) <br />_ Wildlife Habitat(WL) <br />IndustriallCommeroial(IC) <br />_ Solid Waste Disposal{WD) <br />13. Primary present land use (check ane): <br />_ Cropland(CR) Pastureland(PL) <br />x Rangeland(RL) Fores[ry(FR) <br />_ Residential(RS) Recrea[ion(RC) <br />_ Developed WaterResources(WR) <br />_ General Agriculnue(GA) <br />_ Wildlife Habimt(WL) <br />_ Industrial/Commercial(IC) <br />14. Method ofMinine: Briefly explain mining method (e.g.tmcklshovel): Primarily front-end loader, tractor _ <br />with blade and trucks. <br />I5. On Site Processine: Crushing/Scrcening (not anticipated) <br />13.1 Briefly explain mining method(e.g.tmck/shovel): Material will be mined with a front-end loader <br />or pushed un with tractor and blade, stockpiled, and loaded out. A bull dozer and/ <br />or scraper could be utilized if necessary. <br />List any designated chemicals oracid-producing materials to be used or stored within permit area: <br />16. Description of Amendment ur Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />