My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE124218
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE124218
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:21:49 PM
Creation date
11/25/2007 12:24:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Permit File
Doc Date
5/20/2003
Section_Exhibit Name
Appendix W 2002 Report Section 3.0 to 7.0
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 7.0 Miscellaneous <br />7.1 Vegetation Monitoring on Trapper Reclaimed Lands (2002) <br />Routine vegetation monitoring on 227 acres of reclaimed Trapper rangelands in Ashmore, Derringer, <br />Flintlock and Hawken pits was accomplished during the 2002 field season. A total of 59 50-meter <br />transects were monitored. Vegetation parameters sampled included ground cover, species <br />composition and woody stem density. <br />The second year of Phase III bond release sampling occurred on 407 acres of reclaimed croplands in <br />Ashmore, Browning and Coft pits, and on 1,481 acres of reclaimed rangelands in Ashmore, Colt, <br />Derringer and Enfield pits. IME (Kent Crofts) from Yampa, Colorado conducted the Phase III <br />sampling. The Phase III bond release application (SL-4) will be submitted in early 2003. <br />Vegetation monitoring planned for 2003 will include routine sampling of non-Phase III rangelands <br />(selected reclaimed parcels seeded from 1993 through 2002). <br />7.2 Grazing of Reclaimed Lands <br />No cattle grazing occurred on Trapper reclaimed lands during 2002, nor is grazing planned for 2003. <br />7.3 2003 Revegetation Seed Mixes <br />• Section 3.6.3.5 of Trapper's Mining and Reclamation permit requires that the Division be notified of <br />the seed mixtures proposed to be used each year. Tables 7-1 through 7-3 give the 2003 proposed <br />mixtures. <br />7.4 Derringer Pit Interseeding Project <br />Parcels reclaimed from 1997 to 2000, encompassing 123.0 acres, were interseeded in Fall 2002 with <br />a mixture of shrubs and non-aggressive (orbs (see Table 7.5 in 2001 Annual Report). Interseeding <br />was conducted because 2001vegetation sampling showed that shrub density in this area was less <br />than the 400-stems/acre standard. The forbs were included to improve overall plant community <br />diversity. <br />7.5 Trapper Mine Facilities <br />In 2002, in accordance with MR-186, the bulk explosives tanks were moved from the west side of the <br />mine to a spot at the north end of Flintlock Pit. Approval to relocate the explosives magazines from <br />the west side of the mine to the north end of Flintlock Pit was also granted in 2002 (MR-187), but the <br />actual relocation will not occur until 2003. <br />~oMCwzvEC~eav~o7 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.