My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE124206
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE124206
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:21:49 PM
Creation date
11/25/2007 12:23:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
Exhibit 04e-2 AVF Evaluation Fish Creek Mine
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I~ <br />GEOPHYSICAL SOIL MOISTURE ::EASURE"IENTS <br />A geophysical soil moisture measurement study has been conducted in <br />' accordance with Rule 2.06.8 of this application. Data have been col- <br />lected to document soil moisture conditions +ahich exist within the <br />"unconsolidated stream-laid deposits holding streams" shown on Map 1, <br />Twentymile Park Hydrology, and Map 4, Energy Mine No. 3 Ground Water <br />' Hydrology. Specifically, the data were collected to document, if pos- <br />sible, the presence of capillary water extending from the water table <br />upward into the root zone. The study was conducted in late summer <br />(October, 1980), at a time of year when the water table and capillary <br />' fringe should be at their lowest levels. Thus, if capillary water vas <br />found within the root zone at the time of measurement, the root zone <br />could be determined to have a perennial water supply. <br />The soil moisture data were collected by taking measurements in <br />i seven neutron probe access tubes with a nuclear soil moisture gauge. <br />The procedure consisted of drilling a two-inch auger hole through the <br />topsoil and the alluvium to the eater table; setting a two-inch diameter <br />alluvnum irrigation pipe in the hole, allowing the access tube to <br /> settle Eor at least 24 hours; and logging the access tube Erom the <br /> bottom up a t six-inch intervals with the nuclear soil moisture gauge. A <br /> litholog3c description of each auger hole vas obtained during drilling. <br /> The seven neutron probe access tubes are located at sites shown on <br /> Map 4, Energy Mine No. 3 Ground Water Hydrology, in the intermittent and <br /> perennial streams draining the permit area. These locations are: 1) <br />i Foidel 63, on the vest bank of the lover reach of Foidel Creek; 2) <br /> Middle O1, on the east bank of Middle Creek adjacent to Pit 3B South; <br /> 3) Middle A2, on the vest bank of Middle Creek above the confluence with <br /> Foidel Creek; 4) Middle ~J, on the east bank of Kiddie Creek adjacent <br />r <br /> <br />r ~" ( APPR~211~D JUN 2 E 2000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.