My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE124191
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE124191
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:21:48 PM
Creation date
11/25/2007 12:22:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985105
IBM Index Class Name
Permit File
Doc Date
6/18/1985
Doc Name
LIMITED IMPACT SPECIAL TEN DAY 111 PERMIT APPLICATION FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />EXHIBIT B <br />Mining Plan: <br />This is a s tream bed operation. There is no vegetation <br />in the gravel source of the stream. <br />The area on the south bank of the creek is the area <br />that will be used for storage, parking and worki7~g. <br />This area will not have the topsoil removed, b~.rt.will have <br />~~~~ ~~ ~~~~ to be revegitated. ~ <br />The gravel will be dozed into a pile on the working <br />area then loaded into county dump trucks with a Ifront- <br />end loader. <br />Although this is a streambed operation it is normally <br />a dry creek and no surface or sub-surface water fights <br />will be affected. <br />T he depth of the gravel in the streambed will vary from <br />2 to 4 feet in thickness. <br />The water hole shown on C-1 is intermittent and is used <br />by cattle when available. It has no affect on the <br />mining operation. <br />There appears to be a good supply of gravel on the north <br />bank of the stream, but this has not been develo~ed at <br />this time. 'when it is needed the top soil will e saved <br />and stored on the north shore at the east end of the <br />operation. <br />Direction of mining will be from east to west <br />Not over 70,000 tons a material will be mined in any <br />one year. <br />No haul road will need to be constructed. The ranch <br />road can be used. <br />This mine will not be used more tY.an 1$0 days in dny year. <br />The mine will be used periodically when the road Brews are <br />working in the area. The mine will be considered active <br />until time for reclamation. <br />stockpiling is not planned,. but if it becomes necBssary <br />the stockpiles will be for short duration and wil~ be <br />placed on the southside of the creek above the hi h <br />water mark. <br />
The URL can be used to link to this page
Your browser does not support the video tag.