Laserfiche WebLink
1 <br /> ' Exhibit A <br /> ' 1 . Add wood fiber mulch to dried areas of tailings impoundment <br /> 2 . Grade tailings impoundment area <br /> 3. Rip tailings impoundment area <br /> ' 4. Spread lime at 15 ton per acre <br /> 5 . Apply organic fertilizer to tailings impoundment area <br /> 6 . Apply lime at 5 ton per acre <br /> 7 . Apply chemical fertilizer at 500 pounds per acre <br /> ' P. Seed tailings impoundment area at 40 pounds per acre <br /> 9. Apply chemical fertilizer at 250 pounds per acre the first and second <br /> years after seeding <br /> ' IO. Plant 30 4 foot Ponderosa Pine trees intermittently over impoundment area <br /> 11 . Plant Gooseberry and Serviceberry shrubs intermittently over impoundment <br /> area <br /> 12 . Clean up and grade ore storage area along west side of mill building <br /> 13.Spread 3/4 inch roadbase over ore storage area to convert it to parking <br /> ' Equipment/Labor Material <br /> Item Time/Rate Amount Cost Amount <br /> ' 1 . 4 $10 $40. 5T @ $15 $25. <br /> -2. 4 $60 $240. <br /> 3. 2 $60 $120. <br /> 4. 2 $35 $70. 30T @ $20 $600 . <br /> 5. 2 $35 $70. <br /> 6. 2 $35 $70. IOT @ $20 $200. <br /> 7 . 2 $35 $70. 1/2T @ $1000 $500. <br /> ' 8. 2 $35 $70. 801b. @ $2.4 $192. <br /> 9. 4 $35 $140. 1/4T @ $1000 $250. <br /> 10 . 8 $8 $64. 30 @ $20 $600. <br /> 11 . 8 $8 $64. 40 @ $6 $240. <br /> ' 12 . 4 $60 $240. <br /> 13. 2 $60 $120. 18T @ $5. 3 $99. <br /> ' Totals $1378.00 $2706.00 <br /> 1 <br /> 1 <br /> 1 <br />