Laserfiche WebLink
• 2.04.7(1) <br />The following groundwater analysis information has been included in <br />the Permit Document for the 27 months preceding approval of the <br />technical revision: <br />• Table 4A, Quarterly Water Quality Monitoring Results <br />• Table 4B, Water Quality Comparison - 1983 and 1984 <br />• Table 4C, 1983 Monthly Alluvial Well Monitoring Results <br />• Table 4D, 1984 Monthly Alluvial Well Monitoring Results <br />• Table 4E, 1985 Monthly Alluvial Well Monitoring Results <br />• Figure 2A, Water Quality Analysis, Conductivity <br />• Figure 2B, Water Quality Analysis, Iron <br />• Figure 2C, Water Quality Analysis, Manganese <br />• Figure 2D, Water Quality Analysis, SAR <br />• Figure 2E, Water Quality Analysis, Dissolved Solids <br />• Figure 2F, Water Quality Analysis, pH <br />• Figure 2G, Water Quality Analysis, Nitrogen (Ammonia) <br />The approved groundwater monitoring technical revision deleted the <br />• sampling requirements for alluvial well AA2. This well has since <br />been abandoned. <br />Current Water Quality Monitoring Plan <br />The current hydrologic monitoring plan consists of the following: <br />• Alluvial wells AA1 and AA3 <br />- Annual Sampling and analysis - see below <br />- Quarterly collection of Field parameters <br />- Visual inspection of samples for oil and grease <br />• Monitoring Required by Stipulation No. 32 - see below <br />• 1993 Slide French Drains (2 each) <br />- Monthly Flow, Field parameters <br />• Springs G-26A, G-26B and CR-12 <br />- Monthly Flow and Field Parameters May through November <br />continued on page 2.04-30b <br /> <br />2.04-30 Rev. 12-26-95 <br />