Laserfiche WebLink
Table Continued <br /> Unit Cost Cost <br /> Aspect Reclamation Operation Quantity Units $ $ <br /> G. Settling Basin <br /> 1. Will fill with groundwater <br /> H. Access Road <br /> I. To remain following reclamation <br /> 1. Topsoil and Overburden Stockpiles <br /> 1. Material removed for other <br /> Aspects <br /> 2. Seed and mulch 1.5 Ac 800 1,200 <br /> 3. Reseed 20% 0.3 Ac 900 240 <br /> J. Employee Facilities and Maintenance <br /> Station <br /> 1. Scarify compacted ground 0.5 Ac 50 25 <br /> 2. Replace topsoil, 6" x 0.5 acres 400 CY 1.25 500 <br /> 3. Seed and mulch 0.5 Ac 800 400 <br /> 4. Reseed 20% 0.5 Ac 800 400 <br /> K. Asphalt, Concrete and Processing <br /> Plants <br /> 1. Remove electrical lines (any I L.S. 2000 2000 <br /> foundations remaining will be <br /> under water <br /> Total Disturbance Costs 201,072 <br /> Contractor Mobil izationlDemobilization (8%) 0.08 16,086 <br /> Overhead (18.5%) 0.185 40,174 <br /> Administration 5% 0.05 12,867 <br /> Total Proposed Financial Warranty 270,199 <br /> Disturbed Acreage 34.8 <br /> Financial Warranty perAcre 7,764 <br /> Rig er Valle),Resource <br /> DMG 112 Perow <br /> Page 21 <br />