III Illiilllllilllll
<br />_ _ 999
<br />Doc Date:1211112001
<br />•
<br />•
<br />TABLE 49A
<br />Topsoil Stockpile Summary
<br />STOCKPILED ID CURRENT VOLUME
<br />(CY) VOLUME TO BE ADDED
<br />(Cl~ TOTAL VOLUME
<br />(CY)
<br />FCB-1 7,400 0 7,400
<br />FCB-2 350 0 350
<br />FCB-3 170 0 170
<br />FCVF-1 345 0 345
<br />SSS-I 1,980 0 1,980
<br />RDT-1 807 0 807
<br />W WTF-1 4,000 0 4,000
<br />SF-1 54,842 0 54,842
<br />SF-2 55,861 0 55,861
<br />SF-3 109.410 0 109,410
<br />SF-4 3,633 0 3,633
<br />SF-5 700 0 700
<br />SF-6 96,540 444 96,984
<br />SF-7 38,700 0 38,700
<br />SF-8 4,100 0 4,100
<br />SF-9 5,800 0 5,800
<br />SF-10 325 0 325
<br />SF-II 100 0 100
<br />PPSP-1 6,300 0 6,300
<br />PPSP-2 4,170 0 4,170
<br />SF-12,13,14 154,880 0 154,880
<br />SF-15 0 807 807
<br />SF-16 0 2,200 2,200
<br />SF-17 0 888 888
<br />TOTAL 550,413 553,753
<br />(1) The volume listed Por SF-12, 13, &. 14 is split between the three stockpilesd~~hown on Map 29 at SF-12
<br />EASTERN MINING DISTRICT
<br />Dewatering Borehole 7,224 0 7,224
<br />Dewatering Treatment Pond
<br />(includes access road)
<br />0
<br />6,295
<br />6,295
<br />Ventilation Site 4,763 0 4,763
<br />t{ 7 North Escape Shaft 2,222 0 2,222
<br />TOTAL 14,209 6,295 20,504
<br />NORTHERN MINING DISTRICT
<br />,~
<br />Power Borehole 0 5711 5711
<br />Ventilation Shaft & Road 0 2563 2563
<br />TOTAL 0 8274 8274
<br />TR 0 ] -39
<br />8/10/0l
<br />
|