Laserfiche WebLink
• Therefore Rules 2.06.11 and 4.29 are not applicable. <br />Rule 2.06.12 - Surface Coal Mining and Reclamation Operation Requirements <br />Involving the Removal of Coal from Coal Refuse Piles <br />(1) Scope. The provisions os 2.06.12 shall apply to any person <br />engaged in surface coal mining and reclamation operations who removes or <br />intends to remove more than 250 tons of coal from coal refuse piles <br />within 12 consecutive calendar months in any one location. No person <br />shall engage in operations subject to 2.06.12 except under a permit or <br />approval of a revision to an existing permit issued by the Division in <br />accordance with the requirements of 2.06.12. <br />• <br />(2) Application contents. Each application for a permit or <br />approval of a revision to an existing permit subject to the requirements <br />of 2.06.12 shall contain that information required by 2.03, 2.04, 2.05 <br />and 2.06 which is necessary for the Division to make a written <br />determination of compliance with all requirements of the Act and these <br />Rules in accordance with 2.07.6. The information necessary to satisfy <br />this requirement shall be determined in consultation with the Division <br />and consideration shall be given to the specific conditions of the site <br />and scope of the proposed operation. <br />nnamvoa. <br />• The Colorado Yampa Coal Company will not remove any coal from <br />2.06-50 <br />