My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE123774
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE123774
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:21:28 PM
Creation date
11/25/2007 11:53:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006042
IBM Index Class Name
Permit File
Doc Date
6/20/2006
Doc Name
Decision Letter
From
DMG deg
To
MMM Partnership
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />Task # : 002 <br />Date : 05/192006 <br />User : DEG <br />State : CoMrado <br />County :Logan <br />Site :Mmm Partnership Gravel Pit <br />Agency or organization name : DMG <br />Permit or other job action :New 110 Permit <br />Task description :Replace Top <br />HOURLY EQUIPMENT COST <br />From 5 <br />Basic machine :Cat DSR Sedes ll - 8SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $53.92 NA <br /> OperatingcosUhour : $75.29 100 <br /> Ripper op. cosf/hour : $3.99 50 <br /> Operator cosUhour : $32.53 NA <br /> Total unit cost/hour : $165.73 Total fleet cosUhour : f 165.73 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 2,662 CCY factor : 1.125 volume : 2,995 LCY <br /> <br />Source of estimated volume :Operator EsOmate <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 250 feet Material consistency : 1.00 (Caf HB) <br />Unadjusted hourly production : 377.8 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility: 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshifUday) <br />Consolidated stockpile Spoil pile : 0.80 (fnd-rfJ <br /> Push gradient : 1.11 (Cat HB) <br />Average push gradient : 5.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 4,200 feet Material weight : 0.87 (Caf HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,650 Ibs/LCY Net correction : 0.48 <br />Weight description <br />Decomposed rock - 25% Rock, 75% Earth Adjusted unit production : 182.07 LCY/hr <br /> Adjusted fleet production : 182.07 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 16.45 Hours <br />Unit cost : $0.910 /LCY Total job cost : f 2, 726 <br />Permitfjob# : M-2006-042 <br />Abbreviation :none <br />Filename :M042-002 <br />Horsepower: 310 <br />
The URL can be used to link to this page
Your browser does not support the video tag.