Laserfiche WebLink
;< <br />.........: <br />:::.. ;: <br />ROADABLE EQUIPMENT sheet 2 of 2 <br />Nearest major city or town within project area region <br />Transportation Cvcle Time : Non- Total one-way travel distance <br />Roadable Roadable Average travel speed <br />Haul time (hours) = 0.23 0.23 <br />Retum time (hours) = 0.23 0.23 <br />Loading time (hours) = 1.00 NA <br />Unloading time (hours) = 1.00 NA <br />Subtotals = 2.46 0.46 <br />Crook <br />8.0 <br />35.0 <br />miles <br />mph <br />Total non-roadable mob/demob cost' : $3,799.20 <br />• lwo rountl trips with haul rig <br />Total roadable mob/demob cost " : $19.37 <br />•• one round trip, no haul rig <br />JOB TIME AND COST Total job time : 4.91 hours <br />Total iob cost : 53,819 <br />EQUIPMENT HAUL DISTANCE and TIME <br />